FAQ | RESOURCES | ABOUT US | CONTACT US | HOME
bannermap home page
  • OVERVIEW
  • SPECIFICATIONS
  • ESTIMATING
  • INSTALLATION
  • PHOTO GALLERY
  • 360° VIEW
Verazzo logo

Verazzo pic

verazzo unit

Keystone Verazzo Stone™ is finished on two sides, allowing both 1- and 2-sided project designs. It features a natural stone look without the natural stone price and enhances any outdoor décor with natural colors and textures.

 

 

Verazzo logo
  unit specifications
height 6"
width 12/16"
depth 10-1/2"
weight 68lbs
pins yes

Product size, weight, color and product
availability varies by location. Please contact
your local manufacture for up to date
product information.

verazzo unit
verazzo vertical section verazzo setback section
shown in vertical position shown in setback position
Verazzo logo

Use this guide for estimating the number of Keystone Verazzo Stone units required.

WALL HEIGHT
WALL LENGTH (measured at wall face including curves)
6' 12' 18' 24' 30' 36'
6" (1 course) 5 9 14 18 23 27
12" (2 courses) 10 18 28 36 46 54
18" (3 courses) 15 27 42 54 69 81
24" (4 courses) 20 36 56 72 92 108
30" (5 courses) 25 45 70 90 115 135
36" (6 courses) 30 54 84 104 138 162

  Maximum Height Vertical Position   Maximum Height Setback Position
  • Maximum wall height not to exceed 36". The maximum height is based on a level grade, total granular soil, wall built in setback position, and no surcharge. Contact your local Keystone representative for design options on wall heights exceeding 36" or supporting surcharges and backslope
  • Change in color on chart denotes maximum wall height for vertical and setback positions.
  • Keystone recommends cap units as the top course and/or caps of freestanding walls secured with Keystone KapSeal™ adhesive.

 

Verazzo logo
step 1 step 2 step 3
STEP ONE | Prepare the Site STEP TWO | Set Base Course STEP THREE | Pin, Stack & Fill
Start by digging a shallow trench 12" deep by 24" wide. Cut through and remove any sod, roots or large rocks. Place 6" leveling pad of compacted sand or gravel in the trench to receive the first course of Keystone Verazzo Stone. Place and level the first Keystone Verazzo Stone unit. Level each additional unit on the base course as you place it, making sure that the outside edges touch. If your wall contains both straight and curved areas, start with a straight area and build into the curves. Complete the base course before proceeding to the second course.

* Note: For straight line walls, unit faces can be alternated to create a more random look.
Starting with straight areas first, begin placing the second course. Center each Keystone Verazzo Stone unit over the pins on the joints of the course below in a running bond pattern as shown. Now proceed to the next layer, backfilling as you go. For drainage between units and behind the wall, clean gravel or crushed stone is recommended.
VerazzoLogo